Cost to Charge a Mercedes-Benz EQE in Utah

$14.82 for a full charge at 13.37¢/kWh — $4.81 per 100 miles, about $578 a year.

Charging details

Utah residential average, EIA June 2026

Charge from / to 0% → 100%
Comparison assumptions

Mercedes-Benz EQE in Utah

$14.82 for a full charge
Per 100 miles
$4.81
Per mile
$0.05
Per year
$578
vs petrol / yr
$1,056
  • Electricity per year
  • Petrol per year

The full picture

Charging cost breakdown for a Mercedes-Benz EQE
Item Energy Cost
This charge 110.9 kWh $14.82
Full charge (0–100%) 110.9 kWh $14.82
Per 100 miles 36.0 kWh $4.81
Per year (12,000 mi) 4320.0 kWh $578
Same year on petrol (30 mpg) $1,634
Difference $1,056

What charging actually costs here

Filling a Mercedes-Benz EQE from empty in Utah costs $14.82. The car draws 110.9 kWh from the wall for a full 308-mile charge, and Utah residential electricity averages 13.37¢ per kWh. That works out at $4.81 per 100 miles, or $0.05 a mile.

Utah is cheaper than average: 13.37¢ against a national mean of 19.42¢, which ranks it 3 of 51 for electricity price. The same car costs $14.54 to fill in Nevada and $58.46 in Hawaii — a 4.0× spread across the country for identical driving.

Against a petrol car doing 30 mpg at $4.09 a gallon, electricity here is 2.8× cheaper per mile: $4.81 versus $13.62 per 100 miles. Over 12,000 miles a year that is $1,056 saved.

Similar EVs in Utah

Charging cost of comparable EVs in Utah
Vehicle Per 100 mi Full charge Per year
Jeep Wagoneer S 36.2 kWh $14.23 $581
Chevrolet Blazer EV 35.7 kWh $13.51 $573
Lexus RZ 35.3 kWh $10.81 $566
Cadillac Lyriq 36.8 kWh $16.04 $590
Volvo EX90 36.8 kWh $13.58 $590
Genesis Electrified GV70 37.3 kWh $12.47 $598

The same car in nearby-priced states

Charging a Mercedes-Benz EQE in states with similar electricity prices
State ¢/kWh Full charge Per year
Nevada 13.11 $14.54 $566
Nebraska 13.25 $14.69 $572
Louisiana 13.49 $14.96 $583
Tennessee 14.07 $15.60 $608
Arkansas 14.12 $15.66 $610

Frequently asked questions

How much does it cost to charge a Mercedes-Benz EQE in Utah?
$14.82 for a full charge from empty. The car needs 110.9 kWh at the wall and Utah residential electricity averages 13.37¢ per kWh.
How much does a Mercedes-Benz EQE cost per mile in Utah?
About $0.05 a mile, or $4.81 per 100 miles. Over 12,000 miles a year that is roughly $578 of electricity.
Is charging a Mercedes-Benz EQE cheaper than petrol in Utah?
Yes — 2.8 times cheaper per mile. Electricity costs $4.81 per 100 miles here against $13.62 for a 30 mpg petrol car at $4.09 a gallon, a saving of about $1,056 a year.
How long does a full charge last?
The EPA rates the Mercedes-Benz EQE at 308 miles combined. Cold weather, motorway speeds and a loaded car all reduce that; the EPA number is a standardised test, not a guarantee.
Does this include charging losses?
Yes. The EPA's 36 kWh/100 mi figure is measured at the wall socket, so the energy lost in the charger and cabling is already in the number. No extra efficiency factor is applied.

Vehicle data: EPA fueleconomy.gov, model years 2025-2027. Electricity: EIA Electric Power Monthly Table 5.6.A, residential, June 2026. Petrol: EIA weekly retail gasoline price, 24 August 2026.

Estimates for informational purposes only. Real charging cost depends on your tariff, time of use, charger efficiency, temperature, driving style and state of charge. EPA figures are a standardised test result, not a promise about your car.

    to move to open