Cost to Charge a Jeep Wagoneer S in Ohio

$20.42 for a full charge at 19.19¢/kWh — $6.95 per 100 miles, about $834 a year.

Charging details

Ohio residential average, EIA June 2026

Charge from / to 0% → 100%
Comparison assumptions

Jeep Wagoneer S in Ohio

$20.42 for a full charge
Per 100 miles
$6.95
Per mile
$0.07
Per year
$834
vs petrol / yr
$800
  • Electricity per year
  • Petrol per year

The full picture

Charging cost breakdown for a Jeep Wagoneer S
Item Energy Cost
This charge 106.4 kWh $20.42
Full charge (0–100%) 106.4 kWh $20.42
Per 100 miles 36.2 kWh $6.95
Per year (12,000 mi) 4344.0 kWh $834
Same year on petrol (30 mpg) $1,634
Difference $800

What charging actually costs here

Filling a Jeep Wagoneer S from empty in Ohio costs $20.42. The car draws 106.4 kWh from the wall for a full 294-mile charge, and Ohio residential electricity averages 19.19¢ per kWh. That works out at $6.95 per 100 miles, or $0.07 a mile.

Against a petrol car doing 30 mpg at $4.09 a gallon, electricity here is 2.0× cheaper per mile: $6.95 versus $13.62 per 100 miles. Over 12,000 miles a year that is $800 saved.

Similar EVs in Ohio

Charging cost of comparable EVs in Ohio
Vehicle Per 100 mi Full charge Per year
Mercedes-Benz EQE 36 kWh $21.28 $829
Chevrolet Blazer EV 35.7 kWh $19.39 $822
Cadillac Lyriq 36.8 kWh $23.02 $847
Volvo EX90 36.8 kWh $19.49 $847
Lexus RZ 35.3 kWh $15.51 $813
Genesis Electrified GV70 37.3 kWh $17.89 $859

The same car in nearby-priced states

Charging a Jeep Wagoneer S in states with similar electricity prices
State ¢/kWh Full charge Per year
Virginia 17.22 $18.33 $748
Indiana 17.51 $18.64 $761
Minnesota 17.52 $18.65 $761
Delaware 19.29 $20.53 $838
Wisconsin 19.56 $20.82 $850
Illinois 19.89 $21.17 $864

Frequently asked questions

How much does it cost to charge a Jeep Wagoneer S in Ohio?
$20.42 for a full charge from empty. The car needs 106.4 kWh at the wall and Ohio residential electricity averages 19.19¢ per kWh.
How much does a Jeep Wagoneer S cost per mile in Ohio?
About $0.07 a mile, or $6.95 per 100 miles. Over 12,000 miles a year that is roughly $834 of electricity.
Is charging a Jeep Wagoneer S cheaper than petrol in Ohio?
Yes — 2.0 times cheaper per mile. Electricity costs $6.95 per 100 miles here against $13.62 for a 30 mpg petrol car at $4.09 a gallon, a saving of about $800 a year.
How long does a full charge last?
The EPA rates the Jeep Wagoneer S at 294 miles combined. Cold weather, motorway speeds and a loaded car all reduce that; the EPA number is a standardised test, not a guarantee.
Does this include charging losses?
Yes. The EPA's 36.2 kWh/100 mi figure is measured at the wall socket, so the energy lost in the charger and cabling is already in the number. No extra efficiency factor is applied.

Vehicle data: EPA fueleconomy.gov, model years 2025-2027. Electricity: EIA Electric Power Monthly Table 5.6.A, residential, June 2026. Petrol: EIA weekly retail gasoline price, 24 August 2026.

Estimates for informational purposes only. Real charging cost depends on your tariff, time of use, charger efficiency, temperature, driving style and state of charge. EPA figures are a standardised test result, not a promise about your car.

    to move to open