Cost to Charge a Acura ZDX in New Jersey

$30.38 for a full charge at 24.95¢/kWh — $9.41 per 100 miles, about $1,129 a year.

Charging details

New Jersey residential average, EIA June 2026

Charge from / to 0% → 100%
Comparison assumptions

Acura ZDX in New Jersey

$30.38 for a full charge
Per 100 miles
$9.41
Per mile
$0.09
Per year
$1,129
vs petrol / yr
$505
  • Electricity per year
  • Petrol per year

The full picture

Charging cost breakdown for a Acura ZDX
Item Energy Cost
This charge 121.8 kWh $30.38
Full charge (0–100%) 121.8 kWh $30.38
Per 100 miles 37.7 kWh $9.41
Per year (12,000 mi) 4524.0 kWh $1,129
Same year on petrol (30 mpg) $1,634
Difference $505

What charging actually costs here

Filling a Acura ZDX from empty in New Jersey costs $30.38. The car draws 121.8 kWh from the wall for a full 323-mile charge, and New Jersey residential electricity averages 24.95¢ per kWh. That works out at $9.41 per 100 miles, or $0.09 a mile.

New Jersey is more expensive than average: 24.95¢ against a national mean of 19.42¢, which ranks it 43 of 51 for electricity price. The same car costs $15.96 to fill in Nevada and $64.20 in Hawaii — a 4.0× spread across the country for identical driving.

Against a petrol car doing 30 mpg at $4.09 a gallon, electricity here is 1.4× cheaper per mile: $9.41 versus $13.62 per 100 miles. Over 12,000 miles a year that is $505 saved.

Similar EVs in New Jersey

Charging cost of comparable EVs in New Jersey
Vehicle Per 100 mi Full charge Per year
Polestar 3 37.5 kWh $29.19 $1,123
Hyundai Ioniq 9 38 kWh $30.34 $1,138
Ford Mustang Mach-E 37.4 kWh $26.13 $1,120
Genesis Electrified GV70 37.3 kWh $23.27 $1,117
Cadillac Lyriq 36.8 kWh $29.93 $1,102
Volvo EX90 36.8 kWh $25.34 $1,102

The same car in nearby-priced states

Charging a Acura ZDX in states with similar electricity prices
State ¢/kWh Full charge Per year
Connecticut 24.32 $29.61 $1,100
District of Columbia 24.39 $29.70 $1,103
Vermont 24.44 $29.76 $1,106
New Hampshire 27.01 $32.89 $1,222
Alaska 28.21 $34.35 $1,276
Rhode Island 29.23 $35.59 $1,322

Frequently asked questions

How much does it cost to charge a Acura ZDX in New Jersey?
$30.38 for a full charge from empty. The car needs 121.8 kWh at the wall and New Jersey residential electricity averages 24.95¢ per kWh.
How much does a Acura ZDX cost per mile in New Jersey?
About $0.09 a mile, or $9.41 per 100 miles. Over 12,000 miles a year that is roughly $1,129 of electricity.
Is charging a Acura ZDX cheaper than petrol in New Jersey?
Yes — 1.4 times cheaper per mile. Electricity costs $9.41 per 100 miles here against $13.62 for a 30 mpg petrol car at $4.09 a gallon, a saving of about $505 a year.
How long does a full charge last?
The EPA rates the Acura ZDX at 323 miles combined. Cold weather, motorway speeds and a loaded car all reduce that; the EPA number is a standardised test, not a guarantee.
Does this include charging losses?
Yes. The EPA's 37.7 kWh/100 mi figure is measured at the wall socket, so the energy lost in the charger and cabling is already in the number. No extra efficiency factor is applied.

Vehicle data: EPA fueleconomy.gov, model years 2025-2027. Electricity: EIA Electric Power Monthly Table 5.6.A, residential, June 2026. Petrol: EIA weekly retail gasoline price, 24 August 2026.

Estimates for informational purposes only. Real charging cost depends on your tariff, time of use, charger efficiency, temperature, driving style and state of charge. EPA figures are a standardised test result, not a promise about your car.

    to move to open